Top Searches:
All Categories>
Tuoqi (mythical bird of prey)
Release time:
2024-04-03
Source:
深圳市合镁电子有限公司
Number of views:
Customer Name (客户项目):V6
Assessment times (评审次数):**次评审
Assessment:Xie Yong* Tel:13686055*** Q Q:610659****
E-mail:xieyongchao88***@163.com
Prepared Date: 2021.07.26
■ 1. Product parting clamping line review (including the front and rear molds, line clamping line, etc.) The whole machine clamping line schematic diagram
1.1 The difference between the front and rear mold parting section is about 0.05.
2.2 The difference of line position parting section is about 0.03
3.3 The thimble is lower than the rubber surface within 0.05
■ 2. Product gate position analysis (including the location and type of rubber feed, etc.)
■ 3. Product mold pulling analysis (including front and back mold, line position, tilt top direction analysis, etc.)
■ 4. Rubber thickness analysis (including rubber position thick, thin, uneven thickness, etc.)
■ 5. engraving review ■ 6. mold structure review (including mold structure, steel strength analysis, etc.)
■ 7. Product selection and surface requirements (including materials, number of holes, surface treatment, etc.)
8. Product assembly structure review: the whole machine assembly gap assessment
8.1 The gap between the two shells after assembly ( 0.05mm )
8.2 Battery cover and rear shell (0.15mm)
8.3 The amount of the two shells buckle (Recommended: face bottom 0.45; bottom power 0.2mm)
■ 9. Mass production evaluation
10. Requirement Information